Northbank
A reading room and public route through a narrow riverside gap, with a brick base that holds the quay and a lightweight room above.

Brief
Northbank is a gap in a terrace, a set of empty arches, and a public path that currently runs behind a bin store. The trust wanted a reading room, a small archive, and a route that would connect the quay to the street without becoming a shopping arcade.
The brief also asked for a building that could be partly open when the trust is closed. The ground level is conceived as a covered public room; the reading room above is a quieter, controlled space.
Constraint
The site is narrow, the quay wall is listed, and the river is tidal. The ground floor cannot be sealed against occasional flooding, so the archive is raised and the public room is designed to be washed out and hosed down. The upper room is a timber box that spans between two new brick piers, leaving the quay wall untouched.
Planning required a active frontage at street level and a light-touch roofscape. The building is therefore quiet from above and more open at the quay, where the public route passes through.
Intervention
The section drives the plan. A brick base holds the quay and contains the public route, cycle parking, and a small cafe hatch. Above it, a cross-laminated timber room sits like a cabin, with a zinc roof and a continuous brass mesh balustrade that reads as a line rather than a wall.
The route is deliberately not a corridor. It widens at the arches, narrows at the reading room, and ends at a stair that takes visitors up to the street. The archive is a solid block at the quiet end, visible through a single glazed slot.
Northbank is currently on site. The drawings here are the consented design, not the final record. We will publish the as-built set when the building opens.
Drawn at the scale of the decision.
Fabric, light, and the parts that changed.


- A. Chen
- Partner in charge
- N. Fraser
- Project architect
- L. Voss
- Conservation lead
- P. Adeyemi
- Structural engineer
This is a fictional project. Names, clients, dates, and outcomes are invented for the purpose of demonstrating design and engineering.
Have a building like this one?
Send the address, the condition, and the decision you are facing. We will tell you whether the survey is the right first step.
Start a transmittal